The Neutrino Factory and Superbeam Design Study
Members of the Steering Committee
responsible for producing the NufactDS proposal
FP6 Design Study page
: steering committee members should read (at least!)
Section 3.2.4 and section 4 of Annex B1 of the "Work Programme" document.
Sections 1 and 2 and Annex 2 of the "Guide for Proposers: Design studies......".
Time schedule
Meetings
of the Steering Committee
Questions for Brussels
Drafts of documents
for the proposal
Rob Edgecock