The principal objective of the International Design Study of the Neutrino Factory (the IDS) is to deliver the Reference Design Report (RDR), required in 2012/13 and an Interim Design Report (IDR) in 2010/11 as a step on the way.
The international scoping study of a future accelerator neutrino complex was carried out by the international community between NuFact05, Frascati, 21–26 June 2005, and NuFact06. The conclusions of the study were be presented at NuFact06 and published in a written report.
Documents: |
File ![]() | Title | Authors | Date |
|---|---|---|---|
uknfnote_3.ps | The potential of MINOS at the neutrino factory | R.Edgecock | 1999-08-25 |
uknfnote_6.ps | TRIUMF proposal: muon scattering in low Z materials for muon cooling studies | A.Kirk et al. | 1999-11-03 |
uknfnote_7.ps | PPESP proposal: the HARP hadron production experiment | G.Barr et al. | 2000-03-15 |
uknfnote_10.ps | MUSCAT - the muon scattering experiment | D.Attwood et al. | 2000-08-08 |
uknfnote_12.ps | Report to the TRIUMF EEC on MuScat | P.Bell et al. | 2000-11-08 |
uknfnote_14.ps | MuScat contribution to the TRIUMF annual report 2000 | P.Bell et al. | 2001-01-04 |
uknfnote_15.ps | HARP annual report 2000 | G.Barr et al. | 2001-01-15 |
uknfnote_16.ps | MuScat annual report 2000 | W.Allison et al. | 2001-01-16 |
uknfnote_25.doc | UK Participation in a "Superbeam" Neutrino Oscillation Experiment | G.Barr et al. | 2001-09-17 |
uknfnote_29.ps | MuScat contribution to the TRIUMF annual report 2001 | W.Allison et al. | 2002-01-25 |
uknfnote_31.pdf | Neutrino Factory Roadmap 2006 | K.Long et al. | 2006-01-29 |