Agenda for 13 Oct 2006 SWMD Telephone Meeting
Minutes of 28-Sep-2006 meeting
Brief reports on:
- T-480 Data analysis et al
- Wire Tests
- Wakefield Simulations (update from Jonny)
New version of moving mesh GdfidL
(12-Oct): corrects for bug when charge was traveling on a magnetic
wall and napoly integration was needed (ie a scraper/collimator).
The transverse wakepotential calculated was incorrect, often showing
a large offset.
- Merlin Simulations
Rectangular vs. circular apertures
- Collimator designs and manufacturing
Q: What do we want to use next beam time for? What aspect of
design or calculation are we trying to test?
- Review timescales on critical path
- Next meeting -