Agenda for 11 Jan 2006 SWMD Telephone Meeting

  1. CCLRC Engineering server, document index

  2. Material damage
  3. Wire/bench tests
    1. Status of planning tests

  4. Merlin studies
    1. Implementing higher order analytic calculations in Merlin
      German: Higher order modes were separated in the known theoretical paper and they are exactly the same modes we are using for geometric and resistive wakes in MERLIN now. I hope to have this done in nearest weeks.
    2. Parametrisation of e.m. simulations for Merlin?

  5. Wakefield calculations
    1. Progress in understanding GdfidL/MAFIA compared to Cho PAC'01 paper

  6. Progress for ESA tests
    1. Summary from ESA commissioning run: Snapshot of electronic logbook (links will not work),
      Mike Woods' summary
    2. Progress on collimator jaws
      • key workshop staff injured and/or sick so progress not as fast as we had hoped
    3. Wakefield simulations of test beam prototypes
    4. PT's MATLAB reconstruction code

  7. EU organisation Draft 2 of SWMD task in BDS Work Package, sent to Deepa

  8. Future plans
    1. ...
    2. EPAC'06/LCWS'06 contributions...
    3. Next meeting... 25 Jan?