Agenda for 11 Jan 2006 SWMD Telephone Meeting
- CCLRC
Engineering server, document index
- Material damage
- Wire/bench tests
- Status of planning tests
- Merlin studies
- Implementing higher order analytic calculations in Merlin
German: Higher order modes were separated in the known theoretical paper and they are exactly the same modes we are using for geometric and resistive wakes in MERLIN now. I hope to have this done in nearest weeks.
- Parametrisation of e.m. simulations for Merlin?
- Wakefield calculations
- Progress in understanding GdfidL/MAFIA compared to Cho
PAC'01 paper
- Progress for ESA tests
- Summary from ESA commissioning run: Snapshot of
electronic logbook (links will not work),
Mike Woods' summary
- Progress on collimator jaws
- key workshop staff injured and/or sick so progress not
as fast as we had hoped
- Wakefield simulations of test beam prototypes
- PT's MATLAB reconstruction code
- EU organisation Draft
2 of SWMD task in BDS Work Package, sent to Deepa
- Future plans
- ...
- EPAC'06/LCWS'06 contributions...
- Next meeting... 25 Jan?